How It Works Industries FAQ About Articles

The ten solutions

Order Delivery Control Tower Production Disruption Intelligence Inventory Shortage Intelligence Supplier Performance Intelligence Quality Hold Intelligence Capacity and Scheduling Intelligence Maintenance Risk Intelligence Dispatch and Logistics Intelligence Cost and Margin Intelligence Demand and Forecast Intelligence

More

System statusSoon SupportSoon 0800 008 6214 Talk to our team

Production intelligence / Planned expansion

Production Disruption Intelligence

Connect asset, maintenance and schedule signals to understand the true impact of production disruption.

The problem

Objective: Protect throughput.

When a machine stops, the question is never only how long it will be down. It is which jobs were queued behind it, which of those were already tight, and what moving them does to everything else on the floor.

That answer usually gets assembled by hand, in a huddle, from a schedule, a maintenance note and somebody's memory of which customer complained last time.

What it does

Four things it has to get right.

01

Impact before reaction

Translate a stoppage into the specific orders, dates and customers it puts at risk, rather than a downtime figure.

02

What can actually move

Identify which work can be resequenced or moved to another work centre given tooling, skills and material on hand.

03

Conflicts made visible

Surface where a planned maintenance window and a committed order are about to collide, while there is still time to move one.

04

A record of the call

Capture what was decided during a disruption and what it cost, so the next one starts from evidence rather than instinct.

Operational signals

What it reads.

Read-only, from the systems you already run. Nothing is replaced and nothing is written back without an approval.

  • Machine availability
  • Work-centre capacity
  • Maintenance conflicts
  • Affected orders
Illustrative traceProduction intelligence
Work centre 04 unplanned stop, 6 hours and countingAsset
Two priority orders queued behind itSchedule
Alternative routing available on work centre 07Capacity
Resequence proposed for production manager approvalAction

An illustration of the kind of chain the system is designed to surface, not output from a live customer system.

The decision

Who acts on it.

Production management and planning

Decide what to resequence, what to move and what to escalate commercially, with the downstream consequence of each visible before the call is made.

Illustrative scenario

A machine disruption affects two priority orders. Understand which work can move and what needs approval.

Is this the one costing you most?

We start with one measurable operational problem, your existing systems and a decision owner who can act. Tell us where it hurts and we will scope it honestly.