How It Works Industries FAQ About Articles

The ten solutions

Order Delivery Control Tower Production Disruption Intelligence Inventory Shortage Intelligence Supplier Performance Intelligence Quality Hold Intelligence Capacity and Scheduling Intelligence Maintenance Risk Intelligence Dispatch and Logistics Intelligence Cost and Margin Intelligence Demand and Forecast Intelligence

More

System statusSoon SupportSoon 0800 008 6214 Talk to our team

Commercial intelligence / Concept under discovery

Cost and Margin Intelligence

Track what a job is actually consuming against what was quoted, and flag the drift while there is still something to do about it.

The problem

Objective: Protect the margin you quoted.

Job costing usually arrives after the job has closed, in a month end report, by which point the money is spent and the lesson is theoretical.

The expensive decisions, the extra setup, the expedited freight, the third rework, were each small enough to wave through at the time and only add up afterwards.

What it does

Four things it has to get right.

01

Live against quoted

Compare booked labour, material and bought-in cost to the quotation while the job is still running.

02

Drift flagged early

Raise the job when consumption passes a threshold, rather than reporting the overrun once it is complete.

03

Where it went

Attribute the gap to the specific causes, rework, expedite, setup, scrap, rather than a single variance figure.

04

Back into quoting

Feed observed cost patterns by product and customer back into how the next job is priced.

Operational signals

What it reads.

Read-only, from the systems you already run. Nothing is replaced and nothing is written back without an approval.

  • Booked labour and machine time
  • Material issues and scrap
  • Expedite and freight cost
  • Rework and concession cost
Illustrative traceCommercial intelligence
Job at 82 per cent of quoted hours, 50 per cent completeCosting
Two unplanned setups and one rework recordedProduction
Same pattern on the last three jobs for this partHistory
Re-plan and re-quote options preparedAction

An illustration of the kind of chain the system is designed to surface, not output from a live customer system.

The decision

Who acts on it.

Commercial, finance and operations leadership

Decide when to intervene on a running job, when to have the conversation with the customer, and what the next quotation should assume.

Illustrative scenario

A job passes 80 per cent of its quoted hours at the halfway point. See what is driving it and whether the remaining work can be re-planned.

Is this the one costing you most?

We start with one measurable operational problem, your existing systems and a decision owner who can act. Tell us where it hurts and we will scope it honestly.