Order Delivery Control Tower Production Disruption Intelligence Inventory Shortage Intelligence Supplier Performance Intelligence Quality Hold Intelligence Capacity and Scheduling Intelligence Maintenance Risk Intelligence Dispatch and Logistics Intelligence Cost and Margin Intelligence Demand and Forecast Intelligence

More

System statusSoon SupportSoon 0800 008 6214 Talk to our team

Planning intelligence / Concept under discovery

Capacity and Scheduling Intelligence

Compare committed work against real available capacity and show where the schedule stops being achievable.

The problem

Objective: Protect a realistic plan.

A schedule is usually built on standard times, full attendance and no interruptions. Reality supplies none of those, so the plan quietly becomes fiction somewhere in the second week.

The gap is normally discovered on the floor, by the people who have to work around it, rather than in planning while there is still room to change something.

What it does

Four things it has to get right.

01

Load against real capacity

Compare committed work to the capacity actually available once shifts, skills and planned downtime are accounted for.

02

The constraint named

Identify which work centre is the binding constraint in a given period rather than reporting utilisation everywhere.

03

Consequence of a new order

Show what accepting a date does to existing commitments before it is promised to the customer.

04

Where the plan breaks

Flag the point in the horizon where committed work exceeds what can be delivered, with the orders involved.

Operational signals

What it reads.

Read-only, from the systems you already run. Nothing is replaced and nothing is written back without an approval.

  • Work-centre load
  • Shift and skills availability
  • Planned downtime
  • Committed order book
Illustrative tracePlanning intelligence
Week 12 load at 118 per cent of available capacityCapacity
Constraint is the finishing cell, not assemblyConstraint
Two orders have float and could move to week 13Schedule
Achievable plan proposed for planning sign-offAction

An illustration of the kind of chain the system is designed to surface, not output from a live customer system.

The decision

Who acts on it.

Planning and operations leadership

Decide what to accept, what to move and where overtime or outsourcing genuinely pays, before the plan is published.

Illustrative scenario

Sales want to confirm a date in four weeks. See which existing commitments that date would displace before it is promised.

Is this the one costing you most?

We start with one measurable operational problem, your existing systems and a decision owner who can act. Tell us where it hurts and we will scope it honestly.